bridge
| period | description |
|---|---|
| 1846–1850 | planning and construction period |
First railway bridge designed as deep box girder. The designer (Stephenson, 1803-59) used model experiments, ship construction practice, and included towers for adding suspension chains if necessary. Main spans 460 ft wrought iron, total span 1511 ft consisting of two continuous wrought iron tubes side-by-side.