| period | description |
|---|---|
| 1990–1995 | planning and construction period |
With the opening of the Schiphol of Plaza building all pedestrian stream could be combined for the first time into and by the individual terminals of the airport under a roof. In order to summarize the new function of terminal building and station, one removed the place-flanking fronts for that arrival resounding and spanned the intermediate surface with an enormous roof structure, developed again. The connecting light and air ports between takeoff and arrival level create a naturally exposed passage in the underlying projectile to both sides of the Plaza.